FPPD_head
  • slide1
  • slide2
  • slide3
  • slide4
  • slide5
  • slide6
  • slide7
  • slide8
  • slide9
  • slide10
  • slide11
  • slide12
  • slide13
  • slide14
  • slide15
  • slide16
  • slide17
  • slide18
  • slide19
  • slide20
  • slide21

4.3 Network congestion

Network congestion

 

Networks are designed and built to withstand the maximum capacity needed to supply the electricity demand during peak hours. However, as our electricity demand continues to increase, we often reach the limit of this network capacity in certain areas. This video will look at how these problems arise and the solutions available to help manage them.

   

Back

Main Menu

Next